The way to our 91,000 m² building plot leads over a creek, which can carry a lot of water in the rainy seasons, and then goes quite steeply over our self-made path, which is about 1.3 km long and which we still have to develop into a road, to our building plot.
In order to turn the path into a road and to allow construction vehicles to reach the property, we first have to build a bridge over the stream at the foot of our path that can also be used by trucks. The bridge was planned with a length of twelve meters and a width of 5 meters. The first construction works started in June 2021. After completion of the structural work, the bridge had a length of 25 meters and a width of 5 meters.
Now, the construction work to extend our road to the property to road width over a length of 1.3 km can be started so that heavier transport vehicles with construction materials can also reach the property.